Narrow your search

Library

KBR (4)

Belgian Parliament (2)

Hogeschool Gent (2)

UGent (2)

Vlaams Parlement (2)

EHC (1)

UAntwerpen (1)


Resource type

periodical (6)

book (4)

dissertation (2)


Language

Dutch (12)


Year
From To Submit

2014 (1)

2012 (2)

2011 (1)

2010 (2)

2009 (1)

More...
Listing 1 - 10 of 12 << page
of 2
>>
Sort by

Periodical
Infrabel. Verslag.
Author:
Publisher: Brussel Infrabel

Loading...
Export citation

Choose an application

Bookmark

Abstract

Keywords


Periodical
Jaarrekeningen
Author:
Year: 2007 Publisher: Brussel Infrabel

Loading...
Export citation

Choose an application

Bookmark

Abstract

Keywords


Periodical
//Mag : tweemaandeijks personeelsblad van Infrabel
Author:
ISSN: 24063371 Year: 2014 Publisher: Brussel Infrabel

Loading...
Export citation

Choose an application

Bookmark

Abstract

Keywords


Periodical
Jaarverslag ...
Author:
ISSN: 20312296 Year: 2007 Publisher: Brussel Infrabel

Loading...
Export citation

Choose an application

Bookmark

Abstract

Keywords


Periodical
Jaarverslag
Author:
Publisher: Brussel

Loading...
Export citation

Choose an application

Bookmark

Abstract


Periodical
Infrabel. Verslag omtrent de toepassing van artikel VIII van de wet van 21 maart 1991 betreffende de hervorming van sommige economische overheidsbedrijven.
Authors: ---
Publisher: S.l. s.n.

Loading...
Export citation

Choose an application

Bookmark

Abstract

Keywords


Book
Belgian railway infrastructure objectives II : strategisch plan BRIO II 2008-2012
Authors: ---
Year: 2010 Publisher: Brussel : Infrabel,

Loading...
Export citation

Choose an application

Bookmark

Abstract

Keywords

Mobiliteit --- Spoorvervoer.


Book
Jaarverslag 2009
Authors: --- ---
Year: 2010 Publisher: Brussel : Infrabel,

Loading...
Export citation

Choose an application

Bookmark

Abstract

Keywords

Mobiliteit --- Spoorvervoer.


Dissertation
Automatisering wisselverwarming Infrabel.
Authors: --- --- ---
Year: 2012 Publisher: Gent : [s.n.],

Loading...
Export citation

Choose an application

Bookmark

Abstract

Wisselverwarming is nodig om het treinverkeer in de winter vlot te laten verlopen. Zonderwisselverwarming kunnen enorme vertragingen ontstaan.In deze masterproef wordt beschreven hoe de wisselverwarming van het spoorwegnetmomenteel wordt aangestuurd en hoe het systeem kan geautomatiseerd worden. Er wordtgewerkt op basis van de eindwerken van twee masterstudenten die over hetzelfde onderwerponderzoek hebben verricht.Er wordt een studie gedaan naar de mogelijkheden om datacommunicatie te verwezenlijkentussen verschillende PLC’s. Er wordt ook getracht data-uitwisseling te voorzien tussen eenPLC en een SQL-database. Er wordt materiaal besteld om een proefopstelling teverwezenlijken en er wordt bestudeerd hoe deze proefopstelling kan geïntegreerd worden inhet bestaande wisselverwarmingssysteem.Uit de resultaten blijkt dat communicatie tussen PLC’s onderling over grote afstand mogelijkis. Het is praktisch ook haalbaar de proefopstelling te installeren. Ook is communicatiemogelijk met een SQL-database. Tenslotte worden nog enkele suggesties gedaan terverbetering van de automatisering van de wisselverwarming. Rail point heating is required to let the railway traffic run smoothly during the winter. Nopoint heating can cause severe delays.This thesis describes how the point heating of the rail network is currently being managedand how the system can be automated. This project is based on the work of two other studentswho have done research on the same subject.This work contains a study on the possibilities to achieve data communication betweendifferent PLCs. It also seeks to provide data exchange between a PLC and a SQL database.Some hardware has been selected for the trial installation and it is studied how this trialinstallation can be integrated into the existing point heating system.The results suggest that communication between different PLCs on a long distance ispossible. It is also practically possible to install the trial installation and to establishcommunication with a SQL database. Finally, there are some suggestions to improve theautomation of rail point heating.

Keywords


Dissertation
Automatisatie van Wisselverwarming.
Authors: --- --- --- ---
Year: 2011 Publisher: Gent : [s.n.],

Loading...
Export citation

Choose an application

Bookmark

Abstract

De wisselverwarming zorgt ervoor dat wissels niet vastvriezen in de winter door deze op een temperatuur boven het vriespunt te houden wanneer dit nodig is.Het overkoepelende project bestaat uit het automatiseren van de wisselverwarming. Het is in de toekomst niet meer mogelijk om de wisselverwarming lokaal te bedienen. Bij de start van deze masterproef bij Infrabel was het de bedoeling om verder te werken aan de masterproef van T. Van Heirsele.In deze thesis worden verschillende metingen verzameld. Meetgegevens van 2 weerstations plus weersvoorspellingen van een gespecialiseerd bedrijf. De gegevens moeten van een fileserver gehaald worden om deze via scripting naar de database van Infrabel te verplaatsen.Verder blijkt uit de resultaten dat de weerstations goed functioneren en gelijkaardige metingen vertonen. De voorspellingen kunnen beter, maar de toekomst moet uitwijzen of deze voldoen om ook effectief gebruikt te worden. The points heating ensures that switches don’t freeze in winter, by keeping them at a temperature above freezing point, if necessary.The overall project consists of automating the points heating. In the future, it's no longer possible to operate the points heating locally.At the start of this master thesis, at Infrabel, the intention was to continue the work of T. Van Heirsele.In this thesis, different measurements are collected. Measurement data from two weather stations and weather forecasts from a specialized company. The data must be captured from a file server, manipulated by a scripting language and moved to the database of Infrabel.Furthermore, the results show that the weather stations perform well and show similar measurements. The predictions could be better, but the future should determine whether these predictions conform the requirements.

Keywords

Listing 1 - 10 of 12 << page
of 2
>>
Sort by